Archives for September 2019
Amerigo Vespucci #1 Well – Flow-back update
Fremont Petroleum Corporation Ltd (ASX: FPL) (“Fremont” or “the Company”) is pleased to advise that flow-back operations are proceeding to plan on the Amerigo Vespucci #1 well and first hydrocarbon shows have been evidenced over the weekend.
Production Equipment Tie-in at Amerigo Vespucci Well
Fremont Petroleum Corporation Ltd (ASX:FPL) (“Fremont” or “the Company”) is pleased to advise that flow-back operations are proceeding to plan on the Amerigo Vespucci #1 well. As previously advised, the well was placed on an artificial lift system to recover the balance of the fluids that were used to stimulate the Amerigo Vespucci # 1 well during a 5 stage stimulation of the Niobrara formation.
Amerigo Vespucci #1 – Flow Back Operations Update
Fremont Petroleum Corporation Ltd (ASX: FPL) (“Fremont” or “the Company”) is pleased to advise that the Amerigo Vespucci #1 well is flowing back stimulation fluids to surface after completion of a five-stag stimulation operation (see figure 1). This compares to a one-stage stimulation program on the last well, the J.W. Powell. As such, this well has been a much more extensive operation.