Fremont Petroleum Corporation Ltd (ASX:FPL) (“Fremont” or “the Company”) is pleased to advise that flow-back operations are proceeding to plan on the Amerigo Vespucci #1 well. As previously advised, the well was placed on an artificial lift system to recover the balance of the fluids that were used to stimulate the Amerigo Vespucci # 1 well during a 5 stage stimulation of the Niobrara formation.